Safety and production reporting from the plant floor, without the data leaving the plant.
Shift reports, safety statistics and production dashboards. The numbers live on a plant network that never connects to the internet.
Your shift and safety reports build themselves from the plant systems, on the plant network. Nobody retypes a reading again.
For plant engineers, HSE, operations and compliance teams.
The trial runs on Professional, which reads OPC, SQL Server, Oracle and ODBC and includes the command line tool.
No credit card · Your data stays on your PC · Windows, Office 2016+
- Lindsay Works
- Ferrand Mill
- Harbourside Line 2
- Talbot Kiln
- Weyburn Plant
- 1Connect your data
- 2Link the numbers
- 3Color by your rules
- 4Generate one file each
Every shift, two ways.
- The shift engineer reads the figures from the plant systems or the historian
- The HSE or operations lead types them into the shift and safety reports
- Compliance checks them, then the next shift does it all again
- Link the report to OPC, SQL Server or ODBC on the plant network once
- Click Refresh, or let the command line tool run it on a timer
- And that is it. The report is waiting when the shift ends, and nothing ever leaves the plant
Example: a weekly production report and a monthly safety review.
Today: about 2 hours each to collect, type and check: 64 reports, 128 hours a year, about 3.4 working weeks of an engineer's time.
With INSYNCR: link both reports once. Refresh in one click, or schedule it with the command line tool, on a machine inside the plant network.
The industrial and compliance use case
What this industry runs on INSYNCR.
Safety and compliance reporting
Incident rates and inspections where accuracy is a compliance matter, refreshed from the source.
Production and shift reports
Daily or weekly, from the historian or the plant database, with no internet connection needed.
Management and board packs
The monthly deck that reconciles to the operational systems.
What goes on a daily production deck?
A short set that leads to decisions, not every number the plant has:
- OEE and its parts (availability, performance, quality)
- Throughput against plan
- First pass yield and scrap
- Downtime minutes, with a Pareto by reason
- Changeover time
- Schedule adherence
- Work in progress and bottleneck status
- Safety incidents and quality escapes
Start with these, then fit the list to the plant's constraints, the topics of each meeting and who decides what.
What this industry asks before it buys.
The plant network has no outbound route, and it never will.
INSYNCR reads OPC on that network, from a machine on that network, with that machine's credentials. It does not need an internet connection to read the source, and nothing is sent anywhere when it does.
Link once. Refresh forever.
Connect on the plant network
OPC, SQL Server, Oracle or ODBC, with the accounts the engineer already has.
Link the report
Text, tables and charts to tags, queries and cells.
Refresh on schedule
One click, or the command line tool on a timer.
OPC, SQL Server, Oracle, PostgreSQL, ODBC, Excel and text files, the file system. Works with no internet at all.
Professional for this report
Professional includes OPC, the databases and the developer command line tool for scheduled runs.
Questions from this industry
Does it work in an air gapped environment?
Yes. INSYNCR needs no internet connection to run. Licenses can be activated in a way that suits the network; say so on the quote request.
Can a report run on a timer?
Yes. The developer command line tool refreshes or generates a deck from a script, so a shift report can build itself before the meeting.
What does IT need to approve?
A desktop add in for Microsoft PowerPoint on Windows, no service, no agent, no upload. The For IT page has the summary as a PDF.
The pages behind this one.
Wondering what the rebuilding costs you now? Put four numbers in and see

